Fitting a walk-in shower
- Difficulty:
- Demanding
- Duration:
- 3 to 5 working days, spread over 2 weeks because of the drying times
- Questions:
- 19
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 16 steps

A walk-in shower looks simple, but everything that matters is under the tiles: a drain that fits in the height you have, a floor with a 1.5% fall and waterproofing without a single weak spot. Tiles and joints are not watertight by themselves.
We ask about your shower zone, your floor, your drain point and your walls, and work out what you need: the sloped board or tray, the drain and the fittings, mortar, primer, waterproofing, band and the glass screen. Then you get a step-by-step plan in the order a professional works, with the drying times. If there is too little height, underfloor heating is in the way, the floor is timber or there is no drain point, we tell you honestly what has to happen first. The tiling itself is in the jobs Tiling a wall and Tiling a bathroom floor.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorTiling a bathroom wallWall tiles on plasterboard, plaster or existing tiles, with the right primer and waterproofing in the wet zone.Moderate15 questions2 to 4 days, plus drying timeView this job
3D configuratorTiling a bathroom floorCeramic tiles on screed, existing tiles or timber, with the right preparation and waterproofing.Moderate17 questions2 to 4 days, plus drying timeView this job
3D configuratorLaying drain pipesNew PVC or PP drain pipes from your appliances to the stack, with the right diameters, the right fall and a test with water.Moderate14 questions1 to 3 daysView this job
3D configuratorLaying water supply pipesNew hot and cold water pipes in multilayer pipe, from a manifold to every tap point, with pressure test and flushing.Demanding18 questions2 to 4 days, plus drying timeView this job
3D configuratorBreaking out a floorBreaking out tiles, screed and a concrete floor on the ground yourself: safe for asbestos, pipes and dust, with the right demolition hammer and a plan for the rubble.Demanding17 questions2 to 4 days for 20 m²View this job