Laying drain pipes

Difficulty:
Moderate
Duration:
1 to 3 days
Questions:
14
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
20 steps

A drain only works when three things are right: the diameter of each pipe, a fall of 1.5 to 2 cm per metre and proper venting. We ask which appliances you connect, how long the pipe will be and what you connect to, and work out pipes, bends, branches, clips and tools.

Then you get a step-by-step plan from setting out the fall to the test with water. If the stack is cast iron, PE or fibre cement, a plumber makes the last joint. With asbestos, too little height or a pipe to the outside, we tell you what has to happen first.