Breaking out a floor
- Difficulty:
- Demanding
- Duration:
- 2 to 4 days for 20 m²
- Questions:
- 17
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 14 steps

Breaking out a floor is heavy, dusty work, but with the right preparation you can do it yourself. Before you start, you need to know whether there may be asbestos in the glue, which pipes run through the floor and whether the floor rests on something or carries something itself.
We ask about your floor, its layers and its pipes, and work out how much rubble you will get. You get the dust protection, the tools and a step-by-step plan from the test hole to a clean base. With asbestos, a structural floor or a gas pipe, we tell you honestly who does that work.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorRenting a waste containerChoose a container, big bags or the trailer for your construction waste, with the right size, the permit for the street and what may not go in.Easy16 questionsHalf a day to arrange, plus the days you loadView this job
3D configuratorDigging and excavatingDigging by hand or with a hired mini digger for a new floor build-up, a trench or an area outside, safely and by the rules.Moderate16 questions1 to 3 days, after waiting 3 working days for the KLIP plansView this job
3D configuratorPouring a concrete floorA concrete slab on the ground, indoors on the ground floor or outdoors for a shed or garage: base layer, film, reinforcement, ordering concrete, pouring and curing.Demanding15 questions2 to 3 days of work, plus 4 weeks of curingView this job
3D configuratorInsulating a floorInsulation boards in PIR or XPS on the slab, under the screed: with film, edge insulation, room for pipes and a build-up that fits your height.Moderate15 questions1 to 2 days for 20 m², not counting the screedView this job
3D configuratorLaying a screedA traditional cement screed, bonded, on film or floating on insulation: edge strip, mesh, rails, mixing, laying and drying.Demanding19 questions1 to 2 days of work, plus at least 4 weeks of dryingView this job