Tiling a bathroom floor
- Difficulty:
- Moderate
- Duration:
- 2 to 4 days, plus drying time
- Questions:
- 17
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 15 steps

Tiling a bathroom floor takes more than tiles and adhesive. The substrate has to be dry, sound and flat, there belongs a waterproofing layer under the tiles, and the adhesive, joint width and trowel depend on the tile size and on any underfloor heating.
We ask about your substrate and your tiles and work everything out: from primer to silicone, and all the tools. With damp, a weak screed, a flexing timber floor or suspected asbestos, we tell you what has to happen first.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorTiling a bathroom wallWall tiles on plasterboard, plaster or existing tiles, with the right primer and waterproofing in the wet zone.Moderate15 questions2 to 4 days, plus drying timeView this job
3D configuratorFitting a walk-in showerA shower level with the floor: sloped board or flat tray, the drain, a watertight shower zone and the glass screen.Demanding19 questions3 to 5 working days, spread over 2 weeks because of the drying timesView this job
3D configuratorLaying a screedA traditional cement screed, bonded, on film or floating on insulation: edge strip, mesh, rails, mixing, laying and drying.Demanding19 questions1 to 2 days of work, plus at least 4 weeks of dryingView this job
3D configuratorLaying underfloor heatingWater underfloor heating in a new screed: edge strip, stud panels or tacker system, the pipes in a snail pattern, the manifold and the pressure test.Demanding18 questions1 to 2 days of laying, 24 hours of pressure testing; then the screed and at least 28 days of waitingView this job
3D configuratorTiling a floor (living space)Laying tiles in a living room, kitchen or hall: setting the floor out, laying large tiles flat, movement joints and tiling on underfloor heating.Demanding19 questions3 to 5 days, plus drying timeView this job