Floors
A floor is a build-up of layers. At the bottom the structural floor, on top of it insulation, perhaps underfloor heating, then the screed and at the top the finish you see. Every layer has to be dry and flat before the next one goes on.
If you only want a new finish, choose laminate, vinyl, parquet or tiles. If you are starting from scratch, you will also find the jobs for the layers underneath here. The project "New floor build-up on the ground floor" shows the order they come in and how long you have to wait in between.

Jobs in this category8 jobs
For every job we ask about your situation and you get a step-by-step plan and two shopping lists made for you.
3D configuratorLaying laminate flooringA floating click laminate floor in a dry living space, with the right underlay, expansion gaps and skirting.Easy15 questions1 to 2 days, after 48 hours of acclimatisingView this job
3D configuratorLaying vinyl flooringClick vinyl or glue-down vinyl, in planks or tiles, in a dry room or a bathroom, on a substrate that you first make flat and smooth.Moderate20 questions1 to 3 days, after 48 hours of acclimatisingView this job
3D configuratorLaying parquet flooringEngineered parquet, floating on an underlay or glued to the screed, with oiling or lacquering when the boards are unfinished.Moderate18 questions2 to 3 days, after 48 hours of acclimatisingView this job
3D configuratorTiling a floor (living space)Laying tiles in a living room, kitchen or hall: setting the floor out, laying large tiles flat, movement joints and tiling on underfloor heating.Demanding19 questions3 to 5 days, plus drying timeView this job
3D configuratorLaying a screedA traditional cement screed, bonded, on film or floating on insulation: edge strip, mesh, rails, mixing, laying and drying.Demanding19 questions1 to 2 days of work, plus at least 4 weeks of dryingView this job
3D configuratorPouring a concrete floorA concrete slab on the ground, indoors on the ground floor or outdoors for a shed or garage: base layer, film, reinforcement, ordering concrete, pouring and curing.Demanding15 questions2 to 3 days of work, plus 4 weeks of curingView this job
3D configuratorLaying underfloor heatingWater underfloor heating in a new screed: edge strip, stud panels or tacker system, the pipes in a snail pattern, the manifold and the pressure test.Demanding18 questions1 to 2 days of laying, 24 hours of pressure testing; then the screed and at least 28 days of waitingView this job
3D configuratorInsulating a floorInsulation boards in PIR or XPS on the slab, under the screed: with film, edge insulation, room for pipes and a build-up that fits your height.Moderate15 questions1 to 2 days for 20 m², not counting the screedView this jobProjects with jobs from this category
Taking on more than one job? A project puts everything in the right order.

Renovating a complete bathroom
From demolition to inspection: all the jobs of a bathroom renovation in the order you carry them out.10 steps, 21 jobsView the project
Converting the attic into a room
From bare attic to bedroom or office: roof window, insulation, electrics, walls and finishes in the right order.9 steps, 12 jobsView the project
New floor build-up on the ground floor
Replacing an old floor with an insulated build-up of concrete, pipes, underfloor heating, screed and a new finish.8 steps, 12 jobsView the project