Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Fitting a bath
- Difficulty:
- Moderate
- Duration:
- 1 to 2 days, plus 24 hours for the sealant joint to cure
- Questions:
- 18
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 24 steps

Fitting a bath is not difficult work, but it is work where the order matters. Waste and overflow go on the bath before it is in place, everything is tested with water before anything is closed, and you seal the joint with the bath filled. Skip that and you will be breaking out tiles later to find a drip.
We ask about your bath, your floor, the drain point, the tap and the finish, and work everything out: drain, support battens, tapes, sealant, the boards or blocks for the surround and the tools. Then you get a step-by-step plan for your bath. If there is no drain yet, the floor is not strong enough or there may be asbestos in the old surround, we tell you what has to happen first. The tiling itself and new pipes are separate jobs.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorTiling a bathroom wallWall tiles on plasterboard, plaster or existing tiles, with the right primer and waterproofing in the wet zone.Moderate15 questions2 to 4 days, plus drying timeView this job
3D configuratorLaying drain pipesNew PVC or PP drain pipes from your appliances to the stack, with the right diameters, the right fall and a test with water.Moderate14 questions1 to 3 daysView this job
3D configuratorLaying water supply pipesNew hot and cold water pipes in multilayer pipe, from a manifold to every tap point, with pressure test and flushing.Demanding18 questions2 to 4 days, plus drying timeView this job
3D configuratorFitting a washbasin or vanity unitA wall-hung or floor-standing vanity unit or a basin on its own, with tap, trap and mirror, on existing supply points.Moderate17 questionsHalf a day, plus 24 hours of drying timeView this job
3D configuratorFitting a walk-in showerA shower level with the floor: sloped board or flat tray, the drain, a watertight shower zone and the glass screen.Demanding19 questions3 to 5 working days, spread over 2 weeks because of the drying timesView this job