Skip to content
BouwMaat

Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.

Fitting a bath

Difficulty:
Moderate
Duration:
1 to 2 days, plus 24 hours for the sealant joint to cure
Questions:
18
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
24 steps

Fitting a bath is not difficult work, but it is work where the order matters. Waste and overflow go on the bath before it is in place, everything is tested with water before anything is closed, and you seal the joint with the bath filled. Skip that and you will be breaking out tiles later to find a drip.

We ask about your bath, your floor, the drain point, the tap and the finish, and work everything out: drain, support battens, tapes, sealant, the boards or blocks for the surround and the tools. Then you get a step-by-step plan for your bath. If there is no drain yet, the floor is not strong enough or there may be asbestos in the old surround, we tell you what has to happen first. The tiling itself and new pipes are separate jobs.

Often combined with

Jobs that usually come just before or after this one.