Laying a screed
- Difficulty:
- Demanding
- Duration:
- 1 to 2 days of work, plus at least 4 weeks of drying
- Questions:
- 19
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 18 steps

The screed is the flat layer between the bare floor and your floor covering. You can lay a traditional, earth-moist cement screed yourself, but it is heavy work that has to be finished in one day: 10 m² at 5 cm is already a tonne of mortar. The build-up has to be right, because a screed that is too thin or is stuck to the walls will crack.
We ask about your substrate, the build-up and the thickness and work everything out: mortar or sand and cement, edge strip, film, reinforcement mesh and the tools. Then you get a step-by-step plan from marking the level to the drying time for your floor covering. A poured screed, a timber floor or a floor that may not carry the weight: then we tell you honestly who you need.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorInsulating a floorInsulation boards in PIR or XPS on the slab, under the screed: with film, edge insulation, room for pipes and a build-up that fits your height.Moderate15 questions1 to 2 days for 20 m², not counting the screedView this job
3D configuratorLaying underfloor heatingWater underfloor heating in a new screed: edge strip, stud panels or tacker system, the pipes in a snail pattern, the manifold and the pressure test.Demanding18 questions1 to 2 days of laying, 24 hours of pressure testing; then the screed and at least 28 days of waitingView this job
3D configuratorTiling a floor (living space)Laying tiles in a living room, kitchen or hall: setting the floor out, laying large tiles flat, movement joints and tiling on underfloor heating.Demanding19 questions3 to 5 days, plus drying timeView this job
3D configuratorPouring a concrete floorA concrete slab on the ground, indoors on the ground floor or outdoors for a shed or garage: base layer, film, reinforcement, ordering concrete, pouring and curing.Demanding15 questions2 to 3 days of work, plus 4 weeks of curingView this job
3D configuratorBreaking out a floorBreaking out tiles, screed and a concrete floor on the ground yourself: safe for asbestos, pipes and dust, with the right demolition hammer and a plan for the rubble.Demanding17 questions2 to 4 days for 20 m²View this job