Laying underfloor heating

Difficulty:
Demanding
Duration:
1 to 2 days of laying, 24 hours of pressure testing; then the screed and at least 28 days of waiting
Questions:
18
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
19 steps

Laying the pipes of underfloor heating is something you can do yourself: it is patient work on your knees, not work with flame or gas. What counts is the preparation: a layout plan calculated for your home, a flat and insulated base, circuits in one length that are not too long, and a 24-hour pressure test before the screed goes on.

We ask about your rooms, your base and your system and work out the panels, the pipe, the number of circuits, the manifold and all the tools. The step-by-step plan runs from the arrangements with the installer to heating up the screed. Connecting the manifold to the boiler or the heat pump and starting the installation up remains work for the installer; the insulation and the screed are separate jobs.