Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Replacing a central heating boiler
- Difficulty:
- Easy
- Duration:
- Half a day of your own work, the installer 1 day
- Questions:
- 16
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 16 steps

Replacing a central heating boiler is not DIY work: gas, the flue and starting up are for the installer, and a recognised technician inspects the boiler before it may run. Still, you can do a lot yourself: choose the right boiler, compare quotes, get the place ready and, after fitting, bleed, top up and set it to save energy.
We ask about your home, your present heating and where the boiler goes. Then you get a step-by-step plan that says what you do yourself, what you ask the installer and which papers you must receive. With a collective boiler or without gas in the street, we tell you what to do instead.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorFitting or replacing a radiatorHanging a panel radiator and connecting it to your existing central heating, with new valves, refilling and bleeding.Moderate17 questions1 day for one or two radiatorsView this job
3D configuratorInstalling a heat pumpChoose the heat pump that suits your house, prepare the base, the condensate drain and the wall passage yourself, and know what the certified professional does.Moderate28 questions1 to 3 days of your own work, plus the installerView this job
3D configuratorLaying underfloor heatingWater underfloor heating in a new screed: edge strip, stud panels or tacker system, the pipes in a snail pattern, the manifold and the pressure test.Demanding18 questions1 to 2 days of laying, 24 hours of pressure testing; then the screed and at least 28 days of waitingView this job
3D configuratorPulling electrical circuitsNew circuits from the consumer unit to every socket, light point and appliance: chases, flush boxes, conduit and wire, and the diagrams for the inspection.Demanding15 questions2 to 5 days, depending on the number of pointsView this job
3D configuratorLaying drain pipesNew PVC or PP drain pipes from your appliances to the stack, with the right diameters, the right fall and a test with water.Moderate14 questions1 to 3 daysView this job