Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Digging and excavating
- Difficulty:
- Moderate
- Duration:
- 1 to 3 days, after waiting 3 working days for the KLIP plans
- Questions:
- 16
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 17 steps

Digging looks simple, but anyone who digs in Flanders must first request the plans of cables and pipes. Next to a wall you may not go deeper than the footing, and a deep pit can collapse. The soil also has to go somewhere, and there are rules for that.
We ask where and how deep you dig, what is in the ground and what comes after the digging. You get the tools you need and a step-by-step plan from the KLIP request to a flat, firm bottom. With a footing you would undermine, groundwater, asbestos or a pit deeper than 1.20 m, we tell you honestly who has to do it.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorPouring a concrete floorA concrete slab on the ground, indoors on the ground floor or outdoors for a shed or garage: base layer, film, reinforcement, ordering concrete, pouring and curing.Demanding15 questions2 to 3 days of work, plus 4 weeks of curingView this job
3D configuratorBreaking out a floorBreaking out tiles, screed and a concrete floor on the ground yourself: safe for asbestos, pipes and dust, with the right demolition hammer and a plan for the rubble.Demanding17 questions2 to 4 days for 20 m²View this job
3D configuratorRenting a waste containerChoose a container, big bags or the trailer for your construction waste, with the right size, the permit for the street and what may not go in.Easy16 questionsHalf a day to arrange, plus the days you loadView this job