Skip to content
BouwMaat

Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.

Placing a garden shed

Difficulty:
Moderate
Duration:
2 to 4 days, plus drying time of the stain
Questions:
18
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
20 steps

With two people you can put up a log cabin kit in a few days, as long as the base is level and the timber has room to move. The walls are not screwed together, the first coat of stain has to go on before assembly and the roof gets roofing felt or shingles.

We ask about the size and the location, check whether you may build without a permit, and work out what you need besides the kit: base, roof covering, stain, anchoring and tools. If there is an old shed with corrugated sheets, we tell you how to remove it safely or who has to do it. Metal and plastic sheds are outside this plan.

Often combined with

Jobs that usually come just before or after this one.