Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Placing a swimming pool
- Difficulty:
- Moderate
- Duration:
- 1 to 3 days, plus filling
- Questions:
- 18
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 19 steps

You can put up a frame pool, a steel wall pool or a wooden pool yourself, as long as the base is right. The pool has to stand level on a firm base, the filter pump has to be connected safely, and the water needs care every week.
We ask about your pool, the place in your garden, the filter and the power, and work out what you need next to your kit: sand, ground cloth, filter sand or cartridges, the products for the water, a ladder, a cover and what you need for winter. You get a step-by-step plan from the permit rules to getting ready for winter. An in-ground pool of concrete or polyester, and new electrics, you leave to a professional.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorDigging and excavatingDigging by hand or with a hired mini digger for a new floor build-up, a trench or an area outside, safely and by the rules.Moderate16 questions1 to 3 days, after waiting 3 working days for the KLIP plansView this job
3D configuratorBuilding a timber deckA low garden deck of timber or composite on joists, on existing paving or on soil.Moderate15 questions2 to 5 days, longer on soilView this job
3D configuratorPulling electrical circuitsNew circuits from the consumer unit to every socket, light point and appliance: chases, flush boxes, conduit and wire, and the diagrams for the inspection.Demanding15 questions2 to 5 days, depending on the number of pointsView this job
3D configuratorPreparing for the electrical inspection (AREI)Get your electrical installation ready for the inspection: diagrams, labels, a self-check, booking and what to do with the report.Easy17 questionsHalf a day to a day of preparation, plus the visitView this job
3D configuratorRenting a waste containerChoose a container, big bags or the trailer for your construction waste, with the right size, the permit for the street and what may not go in.Easy16 questionsHalf a day to arrange, plus the days you loadView this job