Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Installing LED lighting
- Difficulty:
- Moderate
- Duration:
- Half a day to a full day
- Questions:
- 22
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 17 steps

LED strips and recessed spots give a room atmosphere or good working light. A strip runs on 24 V with a driver; a spot is connected at 230 V to an existing light point. Strip, driver and dimmer have to match, and a spot needs space above the ceiling.
We ask what you want to install and where, and work everything out: strip, profiles, driver, spots, cable, connectors and the tools. Then you get a plan from switching the power off to testing. If you work in the shower zone, in an old ceiling that may hold asbestos or where there is no power yet, we tell you what has to happen first.
Often combined with
Jobs that usually come just before or after this one.
Connecting sockets, switches and light pointsSafely connecting sockets, switches, two-way circuits, lamps and an outdoor lamp with a motion sensor to cables that are already in place.Moderate18 questionsHalf a day to a full dayView this job
Fitting a suspended ceilingA new ceiling of plasterboard on metal profiles and hangers, with insulation, recessed spots or an access hatch if you want them.Moderate15 questions2 to 3 days for a room of 20 m²View this job
3D configuratorPulling electrical circuitsNew circuits from the consumer unit to every socket, light point and appliance: chases, flush boxes, conduit and wire, and the diagrams for the inspection.Demanding15 questions2 to 5 days, depending on the number of pointsView this job
3D configuratorPreparing for the electrical inspection (AREI)Get your electrical installation ready for the inspection: diagrams, labels, a self-check, booking and what to do with the report.Easy17 questionsHalf a day to a day of preparation, plus the visitView this job
3D configuratorFitting or renewing a consumer unitA new single-phase consumer unit with a main residual current device, 30 mA devices and breakers, following the AREI and ready for inspection.Demanding19 questions1 day of preparation, half a day to a full day for the changeover, plus the inspectionView this job