Plastering walls and ceilings

Difficulty:
Demanding
Duration:
1 to 3 days, plus 3 to 4 weeks of drying time
Questions:
18
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
15 steps

Plastering takes practice: the plaster has to go on the wall, be ruled flat and be smoothed at the right moment. With good preparation, rails and a straightedge a DIYer can manage it too, especially one wall at a time.

We ask what is on your wall now, how it absorbs and how thick the layer will be, and work out the plaster, primer, rails, corner beads and all the tools. Then you get a step-by-step plan from covering up to drying. With damp, plaster from before 2001 that has not been tested for asbestos, or old plaster that is loose, we tell you what has to happen first.