Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Fitting an interior door
- Difficulty:
- Moderate
- Duration:
- Half a day to a day per door
- Questions:
- 17
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 21 steps

Fitting an interior door is mostly about accuracy: the frame has to be plumb, the gaps around the door have to be right and a gap stays under the door for ventilation.
We ask what you want to do and measure along with you: the wall opening and the wall thickness, or the inside dimensions of your frame. From that we choose the right standard door, with wedges, screws, foam, adhesive, lock, handles and all the tools. You get a step-by-step plan from taking out the old door to the final check. For a fire-resistant door or an opening that does not fit, we tell you what has to happen first.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorPainting interior woodworkLacquering interior doors, door frames, skirting and windows on the inside: degreasing, sanding, filling, primer and two coats of lacquer.Moderate18 questions2 to 4 days, because of the drying time between coatsView this job
3D configuratorLaying laminate flooringA floating click laminate floor in a dry living space, with the right underlay, expansion gaps and skirting.Easy15 questions1 to 2 days, after 48 hours of acclimatisingView this job
3D configuratorBuilding a partition wallA non-load-bearing interior wall of metal profiles and plasterboard, with insulation against sound.Moderate15 questions2 to 3 days, plus drying time for the jointsView this job
3D configuratorTaking out an interior wallSafely taking out an interior wall that carries nothing: first make sure it really carries nothing, rule out asbestos and pipes, then take it down without spreading dust and make good.Moderate16 questions2 to 4 days, plus drying timeView this job
3D configuratorInstalling ventilationA fan in the bathroom or toilet, or a complete system C with extraction unit, ducts, valves and vents. For a system D you prepare everything.Moderate20 questions1 day for a fan, 3 to 5 days for a system CView this job