Skip to content
BouwMaat

Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.

Insulating an outside wall on the inside

Difficulty:
Moderate
Duration:
2 to 4 days for one wall, not counting the jointing
Questions:
19
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
19 steps

Interior insulation is often the only way to insulate a solid wall, but it is delicate. The wall gets colder and dries more slowly, so damp, cracks or a lot of rain on a thin facade have to be looked at first. That is why we first ask about the state of your facade, and tell you honestly when you should not start yourself.

If it can be done, we work everything out for your wall: profiles, wool and a vapour barrier for a stud lining, or PIR boards with plasterboard and adhesive foam, plus the reveals, the airtight boxes and all the tools. The step-by-step plan runs from checking the facade to the first winter, with the places where it usually goes wrong.

Often combined with

Jobs that usually come just before or after this one.