Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Insulating an outside wall on the inside
- Difficulty:
- Moderate
- Duration:
- 2 to 4 days for one wall, not counting the jointing
- Questions:
- 19
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 19 steps

Interior insulation is often the only way to insulate a solid wall, but it is delicate. The wall gets colder and dries more slowly, so damp, cracks or a lot of rain on a thin facade have to be looked at first. That is why we first ask about the state of your facade, and tell you honestly when you should not start yourself.
If it can be done, we work everything out for your wall: profiles, wool and a vapour barrier for a stud lining, or PIR boards with plasterboard and adhesive foam, plus the reveals, the airtight boxes and all the tools. The step-by-step plan runs from checking the facade to the first winter, with the places where it usually goes wrong.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorJointing and filling plasterboardFinish fitted plasterboard until it is ready to paint, paper or tile: tape, fill coats, corners, sanding and primer.Moderate16 questions3 to 10 days, mostly because of drying timesView this job
3D configuratorPainting walls and ceilingPainting the walls and ceiling of a room with water-based wall paint, with the right preparation and primer.Easy14 questions1 to 2 daysView this job
Connecting sockets, switches and light pointsSafely connecting sockets, switches, two-way circuits, lamps and an outdoor lamp with a motion sensor to cables that are already in place.Moderate18 questionsHalf a day to a full dayView this job
3D configuratorFitting or replacing a radiatorHanging a panel radiator and connecting it to your existing central heating, with new valves, refilling and bleeding.Moderate17 questions1 day for one or two radiatorsView this job
3D configuratorInstalling ventilationA fan in the bathroom or toilet, or a complete system C with extraction unit, ducts, valves and vents. For a system D you prepare everything.Moderate20 questions1 day for a fan, 3 to 5 days for a system CView this job